Skip to main content

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • : Walker
(1793 results)



Display: 20

    • Prior building on site

    •  
    • View of the site where the Federal Reserve Building is to be situated. Previously occupied initially by the Cleveland Masonic Temple, from 1883-1919. The second occupants of the building were comprised of a variety of shops and businesses....
    • Prior building on site

    •  
    • View of the original site where the Federal Reserve Building is situated. Site previously occupied by the Cleveland Masonic Temple, from 1883-1919. The subsequent occupants of the building were comprised of a variety of shops and businesses....
    • Excavation of site

    •  
    • View showing that the prior building on the site has been almost completely demolished. Workers, who are clearing out the rubble from the excavated foundation, are visible. At the rear of the site, two buildings are seen in their entirety, which...
    • Preparation of building site

    •  
    • View taken from the vantage point of the corner of Superior Avenue and East 6th Street. The building site has been fenced in by high barriers and a perimeter walkway has been installed inside the site. Various building materials are visible across...
    • Preparation of building site

    •  
    • View taken inside the building site from the perspective of Superior Avenue. Unobstructed view of the buildings behind the site and the site's back barrier. Several machines are seen in use, and there are temporary wooden structures for storage....
    • Initial phase of construction

    •  
    • View taken within the building site from the perspective of Superior Avenue. Platform for a working generator, along with numerous cranes and cables. There are several workers engaged in a variety of tasks, including an individual who is engaged in...
    • Inital phase of construction

    •  
    • View taken within the building site from the perspective of Superior Avenue. Casual observers are watching the construction from behind the back barrier of the site. Workers are ascending a ladder in order to put a metal tower in place, while...
    • Sub-Floor Installation

    •  
    • View taken inside the building site and from the perspective of Superior Avenue. The sub-floor of the building has been installed on the western side of the site and several metal towers are being put into place. A close-up on the western side...
    • Sub-Floor Installation

    •  
    • View taken inside the building site from the perspective of Superior Avenue. The sub-floor of the building has been installed on the eastern side of the site. Some metal towers being put into place and a variety of cranes, cables and machines are...
    • Sub-floor installation

    •  
    • View from inside the building site from the perspective of Superior Avenue. The sub-floor of the building has been installed on the eastern side of the site. Metal towers are being put into place; a variety of cranes, cables, ladders and machines...
    • Framing of first level

    •  
    • View taken from inside the building site from the perspective of Superior Avenue. Metal framework being erected on the western side of the site. Machines and their operators are visible to the left and the center. At the back on the western...
    • Framing of first level

    •  
    • View taken from inside the building site from the perspective of Superior Avenue. The construction of a wooden barrier wall on the eastern side of the site. At the back of the site, workers can be seen moving the wooden posts being used for the...
    • Sub-floor completion

    •  
    • View from inside the building site at the SW corner from the perspective of Superior Avenue. Completed sub-floor at the first level on the western side of the site. Workers in the access path are unloading sod, while a truck carrying wooden joists...
    • First level framing

    •  
    • View taken inside the building site from the perspective of Superior Avenue. Wooden framing of the first level of the building. The eastern side wall, and the sub-floor are partially covered in wooden planks; several cranes and metal towers are...

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK