|
| Identifier | detsup030.jpg |
| Title | Construction closing the arch on the Detroit - Superior Bridge |
| Description | Construction almost finished with the arch of the Detroit-Superior Bridge. "On that day, the two arms were lowered beginning at 10:30 a.m. By 2:23 p.m., with a 2-hour intermission, the arch was closed. Telephones were used to synchronize the action at each hoisting engine, which turned the toggle screws that closed the arch. The two arms of the arch lined up within 1/8 of an inch. The small difference was adjusted by a cable."--Historic American Engineering Record (HAER-OH-6). |
| Original Date | 1915-10-05 |
| Time Period | Reform and Challenges: 1900-1929 |
| Location Depicted | Cleveland (Ohio)
|
| Subject | Veterans Memorial Bridge (Cleveland, Ohio) Detroit-Superior Bridge (Cleveland) Construction Bridge construction Bridges, Arch Bridges, Steel
|
| LC Subject Headings | Veterans Memorial Bridge (Cleveland, Ohio)
|
| ASCE Subject Headings | Bridges, arch Bridges, truss Bridges, concrete Bridges, steel Bridge construction
|
| Object Type | black-and-white photographs
|
| Repository | Cleveland State University. Michael Schwartz Library. Special Collections. |
| Repository Collection | Cleveland Press
|
| Repository Homepage | http://web.ulib.csuohio.edu/SpecColl/ |
| Digital Collection | Bridges
|
| Donor | Cole, Joseph E.
|
| Copyright | http://www.clevelandmemory.org/copyright/ |
| Format | Jpeg
|
| Language | English
|
| Encyclopedia of Cleveland History Entry | http://ech.case.edu/ech-cgi/article.pl?id=VMB |
| Further Reading | http://hlneogis.ulib.csuohio.edu/chronology.asp?id=CUY0006 |