Cleveland Memory
Skip to content home : browse : advanced search : order prints : preferences : my favorites : about : help   
  Cleveland Memory
 
Search results for Architectural Drawings > 1900-05-08   
Refine your search
Type
Digital Images (2)

results 1-2 of 2 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject: Description:

1. Erection plan for the new Center Street Draw Bridge in Cleveland, Ohio built by King Bridge Co., 1900 Erection plan for the new Center Street Draw Bridge in Cleveland, Ohio built by King Bridge Co., 1900 Center Street Swing Bridge (Cleveland, Ohio); Bridges; Cuyahoga River; Swing bridges; Architectural drawings; Bridge construction; King Iron Bridge & Manufacturing Co.; Truss bridges; Bridges, Steel Civil engineering drawing of the Center Street Swing Bridge, which was constructed over the Cuyahoga River in the Flats in Cleveland, Ohio. Includes a long list of notes addressed to the erector of the...

2. Erection plan for the new Center Street Drawn Bridge in Cleveland, Ohio built by the King Bridge Co., Erection plan for the new Center Street Drawn Bridge in Cleveland, Ohio built by the King Bridge Co., 1900 Center Street Swing Bridge (Cleveland, Ohio); Bridges; Cuyahoga River; Swing bridges; Architectural drawings; Bridge construction; King Iron Bridge & Manufacturing Co.; Truss bridges; Bridges, Steel Erection plan for the new Center Street Drawn Bridge in Cleveland, Ohio built by the King Bridge Co., 1900. Drawing shows measurement and materials need to construct the bridge.
select all : clear all : add to favorites
results 1-2 of 2 item(s)  page 1 of 1 : ( <<  1  >> ) :: previous : next
powered by CONTENTdm ® | contact us  ^ to top ^