home
:
browse
:
advanced search
:
order prints
:
preferences
:
my favorites
:
about
:
help
Cleveland Memory
Search results for
Construction
>
Reports
Refine your search
Creator
Howard, Needles, Tamme...
(17)
Howard, Needles, Tamme...
(2)
Howard, Needles, Tamme...
(1)
Knappen-tippetts-abbet...
(1)
Date
1957-12
(3)
1963-05
(2)
1955-02
(1)
1961-04
(1)
1961-06
(1)
Show more...
results
1
-
20
of
21
item(s)
page 1 of 2 : (
<<
1
2
>>
) ::
previous
:
next
select all
:
clear all
:
add to favorites
Image:
Title:
Subject:
Description:
1.
Corridor report for interstate and alternate routes in the Cuyahoga County freeway system [to Albert S. Porter, Cuyahoga County engineer] December, 1957
Transportation; Traffic engineering; Civil engineering; Willow Freeway; Medina Freeway; Bedford Freeway; Clark Freeway; Northwest Freeway; Airport Freeway; Outer Belt South Freeway; Interstate 90; Interstate 71
"The procedure established for the orderly development of plans for the Cuyahoga County Freeway System contemplated that such planning would be accomplished in three steps: (a.) The preparation of a "Corridor...
2.
Route location studies: Jennings Freeway, Outer Belt South Freeway to Medina Freeway
Jennings Freeway; Transportation; Traffic engineering; Civil engineering
"This report records the results of the preliminary studies regarding the route location for the non-Interstate Jennings Freeway (State Route 176) from the Outer Belt South to the Medina Freeway and is...
3.
Route location studies: Northwest freeway, Lorain County line to West Boulevard
Northwest Freeway; Interstate 90; Interstate highways; Traffic engineering; Civil engineering
"Submitted herewith in fulfillment of Step (b) is Report No. 7 covering Route Location Studies for the Northwest Freeway from the Lorain-Cuyahoga County Line to West Boulevard. This report records the...
4.
Preliminary engineering studies: Willow Freeway, Broadway Avenue to Inner Belt Freeway
Willow Freeway; Clark Freeway; Traffic engineering; Civil engineering
"Presented herewith is Report No. 2 summarizing our Preliminary Engineering Studies for the proposed Willow Freeway from Broadway Avenue to the Inner Belt Freeway. This report does not include certain...
5.
Corridor report for interstate and alternate routes in the Cuyahoga County freeway system [to Albert S. Porter, Cuyahoga County engineer] December, 1957
Transportation; Traffic engineering; Civil engineering; Willow Freeway; Medina Freeway; Bedford Freeway; Clark Freeway; Northwest Freeway; Airport Freeway; Outer Belt South Freeway; Interstate 90; Interstate 71
"The procedure established for the orderly development of plans for the Cuyahoga County Freeway System contemplated that such planning would be accomplished in three steps: (a.) The preparation of a "Corridor...
6.
Route location studies: Medina Freeway, Inner Belt Viaduct to West 25th Street
Medina Freeway; Traffic engineering; Civil engineering; Interstate 71
"Report No. 5 covering the Route Location Studies for (1) the proposed Medina Freeway from the existing Inner Belt Viaduct to W. 25th Street near Scranton Road (2) the proposed Clark Freeway from Fulton...
7.
Route location studies: Outer Belt South Freeway, Broadview Road to Outer Belt East Freeway
Outer Belt South Freeway; Transportation; Traffic engineering; Civil engineering
"The terminals for the study of this project are Broadview Road (S.R. 176) on the west and the Outer Belt East (S.R. 1) on the east. The recommended route location and the suggested basic features of design...
8.
Route location studies: Willow Freeway, Summit-Cuyahoga County line to existing Willow Freeway
Willow Freeway; Transportation; Traffic engineering; Civil engineering; Interstate 77
"Submitted herewith in fulfillment of Step (b), is the Report No. 4 covering the Route Location Studies for the proposed Willow Freeway from the Summit-Cuyahoga County Line northerly to the existing Willow...
9.
Route location studies: Northwest-Clark Freeway, West Boulevard to Fulton Road
Northwest-Clark Freeway; Transportation; Traffic engineering; Civil engineering
"The procedure being followed for the orderly development of plans for the Cuyahoga County Freeway System contemplates that such planning would be accomplished in four steps: (a) The preparation of a Corridor...
10.
Route location studies: Lee Freeway, Outer Belt South Freeway to Clark Freeway
Lee Freeway; Transportation; Traffic engineering; Civil engineering
"From an examination of the proposed freeway system shown in Figure 1, it is evident that the Lee Freeway will serve a dual purpose. First, in conjunction with the Clark or the Outer Belt South Freeway,...
11.
Route location studies: Heights Freeway, Lee Freeway to the Geauga County line
Heights Freeway; Transportation; Traffic engineering; Civil engineering
"Presented in this report are our suggestions as to an appropriate route location and design for a nine-mile section of the Heights Freeway from the proposed Lee Freeway easterly to the Geauga County Line....
12.
Route location studies: Bedford Freeway, Clark Freeway to Heights Freeway
Bedford Freeway; Transportation; Traffic engineering; Civil engineering
"Presented in this report are our suggestions as to an appropriate route location and design for the northerly section of the proposed Bedford Freeway. The east-central section of the City of Cleveland,...
13.
Comprehensive arterial highway plan, Cuyahoga County, Ohio. A report to the Board of County Commissioners, Cuyahoga County, Ohio, February, 1955
Transportation; Traffic engineering; Civil engineering; Inner Belt Freeway; Medina Freeway; Memorial Shoreway; Airport Freeway; Clark Freeway; Northwest Freeway; Willow Freeway; Central Freeway; Heights Freeway; Bedford Freeway; Lee Freeway; Outer Belt South Freeway; Outer Belt East Freeway; Interstate 90; Interstate 480 (Ohio);
"A report to the Board of County Commissioners, Cuyahoga County, Ohio, February 1955." "Scope of the report: The scope of the Consultant's services as determined by the agreement referred to above embraces:...
14.
Corridor report for interstate and alternate routes in the Cuyahoga County freeway system [to Albert S. Porter, Cuyahoga County engineer] December, 1957
Transportation; Traffic engineering; Civil engineering; Willow Freeway; Medina Freeway; Bedford Freeway; Clark Freeway; Northwest Freeway; Airport Freeway; Outer Belt South Freeway; Interstate 90; Interstate 71
"The procedure established for the orderly development of plans for the Cuyahoga County Freeway System contemplated that such planning would be accomplished in three steps: (a.) The preparation of a "Corridor...
15.
Route location studies: Northwest freeway, Lorain County line to West Boulevard
Northwest Freeway; Interstate 90; Interstate highways; Traffic engineering; Civil engineering
"Submitted herewith in fulfillment of Step (b) is Report No. 7 covering Route Location Studies for the Northwest Freeway from the Lorain-Cuyahoga County Line to West Boulevard. This report records the...
16.
Route location studies : Central Freeway, Inner Belt Freeway to Lee Freeway
Central Freeway; Transportation; Traffic engineering; Civil engineering; Interstate 90
"Presented in this report are our suggestions as to an appropriate route location and design for the Central Freeway , a six mile element of the Cuyahoga County Freeway System extending from the existing...
17.
Route location studies : Heights Freeway, Inner Belt Freeway to Lee Freeway
Heights Freeway; Transportation; Traffic engineering; Civil engineering
"Presented in this report are our suggestions as to an appropriate route location and design for a 5.8 mile section of the Heights Freeway between East 55th Street and the Lee Freeway." -- from a letter...
18.
Route location studies : Bedford Freeway, Outer Belt South Freeway to Clark Freeway
Bedford Freeway; Transportation; Traffic engineering; Civil engineering
"Presented in this report are our suggestions as to the most appropriate route location and design for a five-mile section of the Bedford Freeway extending northerly from the Outer Belt South Freeway (Interstate...
19.
Route location studies, Parma Freeway : State Road to Clark Avenue.
Parma Freeway; Transportation; Traffic engineering; Civil engineering
"Presented in this report are our suggestions as to the most appropriate route location and design for a nine-mile section of the Parma Freeway extending northerly from State Road (S.R. 94) near Sprague...
20.
Route location studies : Lee Freeway, Clark Freeway to Lakeland Freeway
Lee Freeway; Transportation; Traffic engineering; Civil engineering
"Presented in this report are our suggestions as to an appropriate route location and design for a seven-mile section of the proposed Lee Freeway extending northerly from the proposed Clark Freeway (Interstate...
select all
:
clear all
:
add to favorites
results
1
-
20
of
21
item(s)
page 1 of 2 : (
<<
1
2
>>
) ::
previous
:
next
powered by CONTENTdm
®
|
contact us
^ to top ^